Mechanical Engineering - Industrial Engineering and Production Management

Exercise : Industrial Engineering and Production Management - Section 1
1.
The aim of value engineering is to
find the depreciation value of a machine
determine the selling price of a product
minimise the cost without change in quality of the product
all of the above
Answer: Option
Explanation:
No answer description is available. Let's discuss.

2.
In time study, the rating factor is applied to determine
standard time of a job
merit rating of the worker
fixation of incentive rate
normal time of a worker
Answer: Option
Explanation:
No answer description is available. Let's discuss.

3.
Gantt chart is used for
inventory control
material handling
production schedule
machine repair schedules
Answer: Option
Explanation:
No answer description is available. Let's discuss.

4.
The main object of scientific layout is
to produce better quality of product
to utilise maximum floor area
to minimise production delays
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.

5.
The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
Answer: Option
Explanation:
No answer description is available. Let's discuss.