Mechanical Engineering - Industrial Engineering and Production Management
Exercise : Industrial Engineering and Production Management - Section 1
- Industrial Engineering and Production Management - Section 1
- Industrial Engineering and Production Management - Section 2
- Industrial Engineering and Production Management - Section 3
- Industrial Engineering and Production Management - Section 4
1.
The aim of value engineering is to
2.
In time study, the rating factor is applied to determine
3.
Gantt chart is used for
4.
The main object of scientific layout is
5.
The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers