1.
Critical path method
helps in ascertaining time schedules
makes better and detailed planning possible
provides a standard method for communicating project plans schedules and to time and cost performance
all of the above
Answer: Option
Explanation:
No answer description is available. Let's discuss.

2.
PERT is applied for
marketing programmes and advertising programmes
installation of machinery
research and development of products
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.

3.
The most important function of inventory control is
stock control system
to run the stores effectively
technical responsibility for the state of materials
all of the above
Answer: Option
Explanation:
No answer description is available. Let's discuss.

4.
Break even analysis represents the relationship between cost and volume.
True
False
Answer: Option
Explanation:
No answer description is available. Let's discuss.

5.
In product layout
specialised and strict supervision is required
machines can not be used to their maximum capacity
manufacturing cost rises with a fall in the volume of production
all of the above
Answer: Option
Explanation:
No answer description is available. Let's discuss.