6.
The bonus increases in proportion to the increase in efficiency. This statement applies to
Halsey plan
Ganttplan
Emerson's efficiency plan
Rowan plan
Answer: Option
Explanation:
No answer description is available. Let's discuss.

7.
Which of the following statement is correct about the network diagram?
The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows.
The tail end of the arrow represents the start of an activity.
The head of the arrow represents the end of an activity.
all of the above
Answer: Option
Explanation:
No answer description is available. Let's discuss.

8.
P.M.T.S. (Predetermined Motion Time Systems) include
M.T.M. (Method Time Measurement)
W.F.S. (Work Factor Systems)
B.M.T.S. (Basic Motion Time Study)
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.

9.
In jobbing production
highly skilled workers are needed
unit costs are high
operations are labour-intensive
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.

10.
Performance rating is equal to
observed performance + normal performance
observed performance - normal performance
observed performance x normal performance
none of the above
Answer: Option
Explanation:
No answer description is available. Let's discuss.