Mechanical Engineering - Industrial Engineering and Production Management - Discussion

Discussion Forum : Industrial Engineering and Production Management - Section 3 (Q.No. 8)
8.
P.M.T.S. (Predetermined Motion Time Systems) include
M.T.M. (Method Time Measurement)
W.F.S. (Work Factor Systems)
B.M.T.S. (Basic Motion Time Study)
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
1 comments Page 1 of 1.

Gowdham said:   6 years ago
The answer is MTM.

Post your comments here:

Your comments will be displayed after verification.