1. 

A critical activity has

A. maximum slack
B. minimum slack
C. zero slack
D. average slack

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

2. 

Sampling method of determining standard time is profitable for long cycle operation.

A. Correct
B. Incorrect

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

3. 

Break even analysis is a

A. short term analysis
B. long term analysis
C. average of short and long term analysis
D. any one of these

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

4. 

In a functional organisation

A. quality of work is better
B. wastage of material is minimum
C. specialised knowledge and guidance to individual worker is provided
D. all of the above

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

5. 

The purpose of micromotion study is to

A. assist in finding out the most efficient way of doing work
B. train the individual operator regarding the motion economy principles
C. help in collecting the motion time data for synthetic time standards
D. all of the above

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.