11.
In perpetual inventory control, the material is checked as it reaches its
maximum value
minimum value
average value
any one of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.

12.
In process layout
handling and back-tracking of materials is too much
production control is more difficult and costly
routing and scheduling is more difficult
all of the above
Answer: Option
Explanation:
No answer description is available. Let's discuss.

13.
A feasible solution to the linear programming problem should
satisfy the problem constraints
optimise the objective function
satisfy the problem constraints and non-negativity restrictions
satisfy the non-negativity restrictions
Answer: Option
Explanation:
No answer description is available. Let's discuss.

14.
Abbreviated work factor data is applied for
material handling operation
maintenance operation
packing and shipping operation
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.

15.
Routing
prescribes the sequence of operations to be followed
determines the programme for the operations
is concerned with starting of processes
regulates the progress of job through various processes
Answer: Option
Explanation:
No answer description is available. Let's discuss.