Mechanical Engineering - Industrial Engineering and Production Management - Discussion

Discussion Forum : Industrial Engineering and Production Management - Section 3 (Q.No. 14)
14.
Abbreviated work factor data is applied for
material handling operation
maintenance operation
packing and shipping operation
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
1 comments Page 1 of 1.

Nitesh said:   7 years ago
This is a higher level system developed from detailed work factor system and it is especially suitable for small quantity job shops. These systems were developed to fill a need for a very simple system of predetermined time standards. They provide a rapid measurement procedure, in as much as they make use the time data.