The aim of value engineering is to
Discussion:
17 comments Page 1 of 2.
SALMAN KHAN said:
9 months ago
Option C is the correct answer.
Ephrem said:
1 year ago
The goal of Value Engineering is minimizing costs and improving functionality or quality.
Rahul Kumar said:
3 years ago
Value Engineering mainly teaches optimisation in the production world.
Karthikeyan said:
5 years ago
Value engineering is used to solve problems and identify and eliminate unwanted costs, while improving function and quality. The aim is to increase the value of products, satisfying the product's performance requirements at the lowest possible cost.
(2)
Kenenisa Bekele BlDiriba said:
6 years ago
Increase quality with average demands and supply.
Nitin joshi said:
8 years ago
Increases tha quality with available resources.
Dhivakar said:
9 years ago
Medium cost and increase quality.
Manoj said:
10 years ago
Value engineering is to remove non value added works like inspection of material and machine setup.
(1)
Vishal Khairnar said:
1 decade ago
Value engineering is the quality product with less cost and with good service life and it require good quality man force and machine set up to achieve good quality.
(1)
Arun mishra said:
1 decade ago
Value engineering is done at time of design. So we have to optimize the product and the best thing can be done is to minimize the cost without compromising the quality.