Mechanical Engineering - Industrial Engineering and Production Management - Discussion
Discussion Forum : Industrial Engineering and Production Management - Section 1 (Q.No. 1)
                   
                                       
                                1.
The aim of value engineering is to
 
                                    Discussion:
17 comments Page 1 of 2.
                
                        Karthikeyan said: 
                         
                        6 years ago
                
                Value engineering is used to solve problems and identify and eliminate unwanted costs, while improving function and quality. The aim is to increase the value of products, satisfying the product's performance requirements at the lowest possible cost.
                
                     (2)
                
            
                        Vishal Khairnar said: 
                         
                        1 decade ago
                
                Value engineering is the quality product with less cost and with good service life and it require good quality man force and machine set up to achieve good quality.
                
                     (1)
                
            
                        SALMAN KHAN said: 
                         
                        11 months ago
                
                Option C is the correct answer.
                
                     (1)
                
            
                        Kenenisa Bekele BlDiriba said: 
                         
                        6 years ago
                
                Increase quality with average demands and supply.
                
                     (1)
                
            
                        Manoj said: 
                         
                        1 decade ago
                
                Value engineering is to remove non value added works like inspection of material and machine setup.
                
                     (1)
                
            
                        Sai dinesh said: 
                         
                        1 decade ago
                
                Minimizing the cost without change in quality of the material is not so easy.
                
                        D.srinivasan said: 
                         
                        1 decade ago
                
                Minimise the cost without change in quality of the product.
                
                        Arun mishra said: 
                         
                        1 decade ago
                
                Value engineering is done at time of design. So we have to optimize the product and the best thing can be done is to minimize the cost without compromising the quality.
                
                        Prabhu said: 
                         
                        1 decade ago
                
                Value engineer must increase the value of product with available benefits.
                
                        GNagaraju said: 
                         
                        1 decade ago
                
                Based on customer needs we need to improve the quality of the product.
                Post your comments here:
 
            
        Quick links
                            Quantitative Aptitude
                                    
                                    Verbal (English)
                                    
                                    Reasoning
                                    
                                Programming
                                    
                                    Interview
                                    
                                     Placement Papers