Civil Engineering - Estimating and Costing - Discussion

Discussion Forum : Estimating and Costing - Section 2 (Q.No. 8)
8.
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
500 m3
1000 m3
1500 m3
2000 m3
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
42 comments Page 4 of 5.

Ziauddin said:   8 years ago
@Deeptikant Sharma.

What is 15/4?

MITHUN said:   8 years ago
Not getting this, please explain.

Vikas kumar said:   8 years ago
2000 Cum is the correct answer.
(1)

Takhe Lomdak said:   1 decade ago
How to calculate this problem?

Amit said:   8 years ago
What is 6.25? Please explain.

Er Sachin singh said:   7 years ago
2000 m3 is the total volume.
(2)

Bhavna said:   8 years ago
Please solve this in detail.

Habib Mansuri said:   1 decade ago
I want explanation answer.

Pratap said:   9 years ago
Please explain in detail.

Bharath said:   8 years ago
6.25 cm fixed ah?