Civil Engineering - Estimating and Costing
Exercise : Estimating and Costing - Section 2
- Estimating and Costing - Section 1
- Estimating and Costing - Section 2
1.
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
2.
For the construction of buildings, the subheads of the estimate are
3.
The measurement is made for stone work in square metre in case of
4.
The 'centre line method' is specially adopted for estimating
5.
The value of 'A' of Indian type W.C. shown in the given figure is :


Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers