Civil Engineering - Estimating and Costing

Exercise :: Estimating and Costing - Section 2

1. 

For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

A. 0.90 m3
B. 0.94 m3
C. 0.98 m3
D. 1.00 m3

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

2. 

For the construction of buildings, the subheads of the estimate are

A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. Plastering or pointing, finishing, water supply and sanitary work
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

3. 

The measurement is made for stone work in square metre in case of

A. Wall facing
B. Columns, lintels, copings
C. Building work
D. Dressed stones in Chajjas
E. (a) and (d) of the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

4. 

The 'centre line method' is specially adopted for estimating

A. Circular buildings
B. Hexagonal buildings
C. Octagonal buildings
D. Other geometrical shaped buildings
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

5. 

The value of 'A' of Indian type W.C. shown in the given figure is :

A. 25 cm
B. 30 cm
C. 40 cm
D. 45 cm

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.