Civil Engineering - Estimating and Costing

Exercise :: Estimating and Costing - Section 2

41. 

The brick work is not measured in cu m in case of

A. One or more than one brick wall
B. Brick work in arches
C. Reinforced brick work
D. Half brick wall.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

42. 

The cross-sectional area of the embankment of a canal fully in embankment in the given figure is

A.
B.
C.
D.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

43. 

The value of 'B' of Indian type W.C. shown in the given figure is :

A. 45 cm
B. 50 cm
C. 30 cm
D. 25 cm

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

44. 

The rate of an item of work depends on

A. Specifications of works
B. Specifications of materials
C. Proportion of mortar
D. Method of construction
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

45. 

Pick up the correct statement from the following:

A. All pipes and fittings are classified according to their diameters
B. The diameter of the pipes is the nominal diameter of internal bore
C. All pipes are measured along the centre line of the pipes in metres
D. Lead caulked joints are enumerated separately
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.