Civil Engineering - Estimating and Costing
Exercise : Estimating and Costing - Section 2
- Estimating and Costing - Section 1
- Estimating and Costing - Section 2
36.
The rate of payment is made for 100 cu m (per % cu m) in case of
37.
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is


38.
Pick up the incorrect statement from the following:
39.
The measurement is made in square metre in case of
40.
Berms are provided in canals if these are