Civil Engineering - Estimating and Costing
Exercise : Estimating and Costing - Section 2
- Estimating and Costing - Section 1
- Estimating and Costing - Section 2
31.
Pick up the correct statement from the following:
32.
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is
33.
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
34.
Pick up the correct statement from the following:
35.
The weight of an item is measured correct to nearest
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers