Civil Engineering - Estimating and Costing

Exercise : Estimating and Costing - Section 2
6.
Referring of given figure, pick up the correct statement from the following:
The total length of centre line of four walls is 20 m
Length of long wall out-to-out is 6.80 m
Length of short walls in-to-in is 3.20 m
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

7.
Size, capacity and materials need be specified for
Bib-cocks
Stop-cocks
Ferrules
Ball valves
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

8.
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
500 m3
1000 m3
1500 m3
2000 m3
Answer: Option
Explanation:
No answer description is available. Let's discuss.

9.
The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
1.00 cubic meter
2.00 cubic meter
3.00 cubic meter
4.00 cubic meter
Answer: Option
Explanation:
No answer description is available. Let's discuss.

10.
Anti-siphonage pipe is connected to
Main soil pipe
Bottom of P trap W.C.
Top of P trap W.C.
Side of water closet.
Answer: Option
Explanation:
No answer description is available. Let's discuss.