Civil Engineering - Estimating and Costing
Exercise : Estimating and Costing - Section 2
- Estimating and Costing - Section 1
- Estimating and Costing - Section 2
6.
Referring of given figure, pick up the correct statement from the following:


7.
Size, capacity and materials need be specified for
8.
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
9.
The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
10.
Anti-siphonage pipe is connected to