8.
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
Discussion:
42 comments Page 1 of 5.
Kabi said:
2 weeks ago
The road is made of two layers:
1. A 15 cm thick concrete layer.
2. A 10 cm thick gravel sub-base layer.
Box cutting is all about how much earth you need to remove, so we only care about the final dimensions of the road profile. So, we need to consider both layers (concrete and gravel) to determine the total depth of the excavation.
1. Calculate the total thickness:
The total thickness is 15 cm (concrete) + 10 cm (gravel) = 25 cm.
We need to convert this to meters: 25 cm = 0.25 m.
2. Calculate the volume:
Volume is calculated by: Length x Width x Height (or Thickness in this case).
Length = 1000 m.
Width = 8 m.
Thickness = 0.25 m.
Volume = 1000 m x 8 m x 0.25 m = 2000 m3.
Therefore, the correct answer is Option D: 2000 m3.
1. A 15 cm thick concrete layer.
2. A 10 cm thick gravel sub-base layer.
Box cutting is all about how much earth you need to remove, so we only care about the final dimensions of the road profile. So, we need to consider both layers (concrete and gravel) to determine the total depth of the excavation.
1. Calculate the total thickness:
The total thickness is 15 cm (concrete) + 10 cm (gravel) = 25 cm.
We need to convert this to meters: 25 cm = 0.25 m.
2. Calculate the volume:
Volume is calculated by: Length x Width x Height (or Thickness in this case).
Length = 1000 m.
Width = 8 m.
Thickness = 0.25 m.
Volume = 1000 m x 8 m x 0.25 m = 2000 m3.
Therefore, the correct answer is Option D: 2000 m3.
Gideon Hniarthul said:
3 years ago
Quantity of cc road = 1000*8*0.15 = 1200 cum.
Quantity of sub-base gravel = 1000*8*0.10 = 800 cum.
Tt. Quantity = 1200 + 800 = 2000 cum.
Formulae for cut-off volume = (1/4)*2000,
= 500 cum.
Box cutting in road crust = 2000-500,
= 1500 cum.
Hence, 1500 cum is the total volume for box cutting in road crust.
Quantity of sub-base gravel = 1000*8*0.10 = 800 cum.
Tt. Quantity = 1200 + 800 = 2000 cum.
Formulae for cut-off volume = (1/4)*2000,
= 500 cum.
Box cutting in road crust = 2000-500,
= 1500 cum.
Hence, 1500 cum is the total volume for box cutting in road crust.
(15)
Vivek Arya said:
6 years ago
Orginal volume = 1000m * 8m * (15cm+10cm),
= 1000 * 8 * 0.25cum,
= 2000 cum.
Cutt-off volume = (1/4) * original volume.
= (1/4) * 2000cum,
= 500cum.
So, Box cutting in road curst = (2000-500).
= 1500cum.
= 1000 * 8 * 0.25cum,
= 2000 cum.
Cutt-off volume = (1/4) * original volume.
= (1/4) * 2000cum,
= 500cum.
So, Box cutting in road curst = (2000-500).
= 1500cum.
Aamir said:
8 years ago
Box cutting means to the excavation of the road so as to fit the road in the excavated portion this is done to make road level with the surrounding, now you have remembered that there is compaction of 6.25cm in gravel in the subbase so remaining total available ht will be 15+3.75cm, and then as usual l*b*h.
Sam said:
4 years ago
Box cutting means the excavation of the road so as to fit the road in the excavated portion this is done to make road level with the surrounding, now you have remembered that there is compaction of 6.25cm in gravel in the subbase so remaining total available ht will be 15+3.75cm, and then as usual l*b*h.
(9)
Bond said:
7 years ago
Sub base =10 cm.
And we take base = to or less than about sub base = 10 cm. Total depth of cutting = 20 cm. Therefore, V cutting = 1000 x 8 x .2= 1600m3.
We excavate less than 1600 so the nearest option is 1500. So correct answer is 1500 m3.
And we take base = to or less than about sub base = 10 cm. Total depth of cutting = 20 cm. Therefore, V cutting = 1000 x 8 x .2= 1600m3.
We excavate less than 1600 so the nearest option is 1500. So correct answer is 1500 m3.
Usman said:
9 years ago
The road is 1000m long = 1000m.
The width is 8m = 8m.
The thickness of slab = 0.15m.
Excavation for sub base (10cm thick - 6.25cm compaction) = 3.75cm for gravel.
So,
1000m x 8m x (0.15m + .0375m).
1000m x 8m x 0.1875m = 1500 cubic m.
The width is 8m = 8m.
The thickness of slab = 0.15m.
Excavation for sub base (10cm thick - 6.25cm compaction) = 3.75cm for gravel.
So,
1000m x 8m x (0.15m + .0375m).
1000m x 8m x 0.1875m = 1500 cubic m.
(1)
Sugadev said:
4 years ago
Orginal volume = 1000m * 8m * (15cm+10cm),
= 1000 * 8 * 0.25cum,
= 2000 cum.
Cutt-off volume = (1/4) * original volume.
= (1/4) * 2000cum,
= 500cum.
So, Box cutting in road curst = (2000-500),
= 1500cum.
= 1000 * 8 * 0.25cum,
= 2000 cum.
Cutt-off volume = (1/4) * original volume.
= (1/4) * 2000cum,
= 500cum.
So, Box cutting in road curst = (2000-500),
= 1500cum.
(15)
Navjot said:
7 years ago
Original volume= as you know = 2000.
Cutt off volume= 1/4 of the original volume.
1/4x2000 = 500cum.
So, box cutting in road = 2000 - 500 = 1500 cum.
Cutt off volume= 1/4 of the original volume.
1/4x2000 = 500cum.
So, box cutting in road = 2000 - 500 = 1500 cum.
Rishabh Machiwal said:
7 years ago
Original Volume= 1000*8*(0.15+0.10)=2000m3,
Cutoff Volume= Original Volume/4=2000/4=500m3,
Box cutting in road crust= 2000-500= 1500m3.
Cutoff Volume= Original Volume/4=2000/4=500m3,
Box cutting in road crust= 2000-500= 1500m3.