8.
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
Discussion:
42 comments Page 2 of 5.
ANANDA MARNDI said:
6 years ago
How to solve this? Please explain me.
Bond said:
7 years ago
Sub base =10 cm.
And we take base = to or less than about sub base = 10 cm. Total depth of cutting = 20 cm. Therefore, V cutting = 1000 x 8 x .2= 1600m3.
We excavate less than 1600 so the nearest option is 1500. So correct answer is 1500 m3.
And we take base = to or less than about sub base = 10 cm. Total depth of cutting = 20 cm. Therefore, V cutting = 1000 x 8 x .2= 1600m3.
We excavate less than 1600 so the nearest option is 1500. So correct answer is 1500 m3.
Sumit said:
7 years ago
How 6.25 cm?
Navjot said:
7 years ago
Original volume= as you know = 2000.
Cutt off volume= 1/4 of the original volume.
1/4x2000 = 500cum.
So, box cutting in road = 2000 - 500 = 1500 cum.
Cutt off volume= 1/4 of the original volume.
1/4x2000 = 500cum.
So, box cutting in road = 2000 - 500 = 1500 cum.
Er Sachin singh said:
7 years ago
2000 m3 is the total volume.
(2)
Sonali said:
7 years ago
I think the answer is 2000m3 is correct.
Bipin said:
7 years ago
Box cutting in road crust= 1000 * 8 * (0.15+0.10).
= 2000m^3.
= 2000m^3.
Vinod said:
7 years ago
What is 6.25?
Burhan said:
7 years ago
@Rishabh.
Why you divide 2000 by 4?
Why you divide 2000 by 4?
Rishabh Machiwal said:
7 years ago
Original Volume= 1000*8*(0.15+0.10)=2000m3,
Cutoff Volume= Original Volume/4=2000/4=500m3,
Box cutting in road crust= 2000-500= 1500m3.
Cutoff Volume= Original Volume/4=2000/4=500m3,
Box cutting in road crust= 2000-500= 1500m3.