Civil Engineering - Construction Management - Discussion

Discussion Forum : Construction Management - Section 2 (Q.No. 18)
18.
For completion of a project, the critical path of the network represents
minimum time
maximum time
maximum cost
minimum cost.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
40 comments Page 2 of 4.

Deep said:   9 years ago
The critical path can be defined in many ways including:

- The longest path in the network diagram, or

- The shortest duration in which the project can be completed.

So answer (a) is correct.

Deepak aryal said:   5 years ago
Minumum time and longest path is the correct answer because we have to choose the longest path so that we can finish in minimum time. This may sound odd but this is the real answer.
(2)

Ajay Kumar Yadav said:   3 years ago
A is the correct answer.

The critical path provides the minimum time required to complete the project. And it provides max. Time among different paths. So option A is correct.
(1)

Samson KP said:   9 years ago
The critical path is the longest duration path through a network diagram and determines the shortest time to complete the project.

Therefore the answer is option A.

Brahvi said:   8 years ago
Answer is correct.

The Critical path has the longest duration but because of zero slacks which determine the shortest time possible to complete the project.

Uttu said:   7 years ago
You can't complete the project in time less than critical time.

So it's the minimum time you need even if you provide more resources.

A is correct.

Robert said:   9 years ago
Well, I think the gist of the question here is for completion of a project, thus making the critical path the minimum time possible.

Ashutosh said:   4 years ago
Answer a is correct. Because critical time wise the longest path but it has minimum duration to complete the whole project.
(3)

Ashfaq said:   6 years ago
The critical path is longest path consumes max time and resources so option B is correct.

Source khurmi book.

Khaled said:   6 years ago
The critical path has the longest duration more than any path in the diagram so the correct answer is B.