Civil Engineering - Construction Management - Discussion

Discussion Forum : Construction Management - Section 2 (Q.No. 18)
18.
For completion of a project, the critical path of the network represents
minimum time
maximum time
maximum cost
minimum cost.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
40 comments Page 4 of 4.

Kdm said:   5 years ago
Critical path is the longest path gives the short duration.

Revathi said:   8 years ago
Option A is correct. I agree with the given answer.

GUNNA SATISH said:   9 years ago
Answer is wrong. Correct answer is maximum time.

Santosh said:   9 years ago
Surely the answer should be B. maximum time.

JAYANT said:   9 years ago
Answer A is completely and absolutely true.

Rajesh said:   1 decade ago
Me to confused the answer must be B.

Tekendra said:   7 years ago
I think the correct answer is B.

UPENDRA said:   8 years ago
I think Option A is correct.

Pravin said:   5 years ago
Thank you so much @Deep.

Himal said:   7 years ago
The right Option is A.