Civil Engineering - Construction Management

Exercise : Construction Management - Section 1
36.
An Executive Engineer may have powers upto
Rs. 25,000
Rs. 50,000
Rs. 100,000
Rs. 200,000
Rs. 500,000
Answer: Option
Explanation:
No answer description is available. Let's discuss.

37.
The main principle of an organisation, is
unity of command
cohegency
effective control at all levels
delegation of authority
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

38.
The estimated time required to perform an activity, is known as
event
dummy
duration
float.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

39.
A CPM family includes
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
CPS (Critical Path Scheduling)
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

40.
The time which results in the least, possible construction cost of an activity, is known
normal time
slow time
crash time
standard time.
Answer: Option
Explanation:
No answer description is available. Let's discuss.