36. 

An Executive Engineer may have powers upto

A. Rs. 25,000
B. Rs. 50,000
C. Rs. 100,000
D. Rs. 200,000
E. Rs. 500,000

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

37. 

The main principle of an organisation, is

A. unity of command
B. cohegency
C. effective control at all levels
D. delegation of authority
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

38. 

The estimated time required to perform an activity, is known as

A. event
B. dummy
C. duration
D. float.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

39. 

A CPM family includes

A. CPA (Critical Path Analysis)
B. CPP (Critical Path Plotted)
C. MCE (Minimum Cost Expenditure)
D. CPS (Critical Path Scheduling)
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

40. 

The time which results in the leasi, possible construction cost of an activity, is known

A. normal time
B. slow time
C. crash time
D. standard time.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.