41.
If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
42.
Works costing less than Rs. 20,000 are treated as
43.
A critical ratio scheduling
44.
Bar charts are suitable for
45.
The first method invented for planning projects, was