31. 

Critical path lies along the activities having total float

A. positive
B. negative
C. zero
D. same.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

32. 

Construction team means

A. an engineer
B. an architect
C. an owner
D. a contractor
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

33. 

Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following:

A. 1. Pouring of Concrete
2. Erection of form work
3. Curing of concrete
4. Removal of form work
B. 1. Erection of form work
2. Pouring of concrete
3. Curing of concrete
4. Removal of form work
C. 1. Removal of form work
2. Erection of form work
3. Pouring of concrete
4. Curing of concrete
D. 1. Pouring of concrete
2. Curing of concrete
3. Erection of form work
4. Removal of form work

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

34. 

A construction schedule is prepared after collecting

A. number of operations
B. output of labour
C. output of machinery
D. quantity of various items
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

35. 

Site order book is used for recording

A. instructions by the executive engineers
B. construction measurements
C. issue of store equipments
D. names of the casual labour.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.