Mechanical Engineering - Industrial Engineering and Production Management

Exercise : Industrial Engineering and Production Management - Section 1
36.
Simplex method is the method used for
value analysis
network analysis
linear programming
queuing theory
Answer: Option
Explanation:
No answer description is available. Let's discuss.

37.
Dispatching
prescribes the sequence of operations to be followed
determines the programme for the operations
is concerned with the starting of processes
regulates the progress of job through various processes
Answer: Option
Explanation:
No answer description is available. Let's discuss.

38.
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
Halsey plan
Gantt plan
Rowan plan
Emerson's efficiency plan
Answer: Option
Explanation:
No answer description is available. Let's discuss.

39.
Job evaluation is the method of determining the
relative values of a job
worker's performance on a job
worth of the machine
value of overall production
Answer: Option
Explanation:
No answer description is available. Let's discuss.

40.
The routing function in a production system design is concerned with
manpower utilisation
quality assurance of the product
machine utilisation
optimising material flow through the plant
Answer: Option
Explanation:
No answer description is available. Let's discuss.