Mechanical Engineering - Industrial Engineering and Production Management - Discussion

Discussion Forum : Industrial Engineering and Production Management - Section 1 (Q.No. 40)
40.
The routing function in a production system design is concerned with
manpower utilisation
quality assurance of the product
machine utilisation
optimising material flow through the plant
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
11 comments Page 1 of 2.

NVK said:   6 months ago
The correct answer is: optimising material flow through the plant.

The routing function in a production system design is concerned with determining the most efficient path or sequence of operations for producing a product. This involves:

- Identifying the necessary operations and their sequence.
- Determining the most efficient route for material flow through the plant
- Minimizing transportation costs and distances
- Reducing handling and storage requirements

The routing function aims to optimize material flow, reducing waste and improving efficiency.

The other options are not correct because:
- Manpower utilisation: This is related to labour planning and scheduling, not routing.
- Quality assurance of the product: This is related to quality control and inspection, not routing.
- Machine utilisation: While routing may consider machine capacity, its primary focus is on material flow, not machine utilization.

=> Routing is a critical function in production planning and control, ensuring that materials move efficiently through the production process, minimizing waste and reducing costs.

Vinay said:   4 years ago
Optimising material flow through the plant is the right answer.

Samaresh said:   5 years ago
D is the correct answer.

C. machine utilisation is done by scheduling.

BHARATH REDDY said:   6 years ago
D is the correct answer.

Manish said:   6 years ago
Option C is correct. I agree with the given answer.

Shiva said:   7 years ago
According to me, D is the right option.

Kk shan said:   8 years ago
I think D is correct.

Neel k said:   8 years ago
Yes, the correct option is D.

Ind Lov said:   8 years ago
I think D is the right option.

Routing tells about material flow in plant.

Hamza said:   8 years ago
Option D is the correct answer.


Post your comments here: