41.
In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.
42.
Direct expenses include
43.
String diagram is used
44.
Which of the following type of layout is suitable for automobile manufacturing concern?
45.
Representative time is the average of times recorded by work study man for an operation.