Civil Engineering - Estimating and Costing - Discussion

Discussion Forum : Estimating and Costing - Section 1 (Q.No. 1)
1.
Pick up the excavation where measurements are made in square metres for payment.
Ordinary cuttings up to 1 m
surface dressing up to 15 cm depths
Surface excavation up to 30 cm depths
Both (b) and (c)
Both (a) and (b)
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
22 comments Page 3 of 3.

Avadhesh said:   1 decade ago
How to make estimation?

Heena said:   1 decade ago
How to estimates valve chamber?


Post your comments here:

Your comments will be displayed after verification.