Pick up the excavation where measurements are made in square metres for payment.
Ordinary cuttings up to 1 m
surface dressing up to 15 cm depths
Surface excavation up to 30 cm depths
Both (b) and (c)
Both (a) and (b)
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
22 comments Page 2 of 3.

Khandeshwar said:   8 years ago
Thanks @Satish.

Tinku said:   8 years ago
Thanks, Satish Deore.

Satish deore said:   8 years ago
Excavation up to 30 cm is measured in sq m and if it is greater than 30 cm then it is measured in the cubic meter.
(1)

Kavitha h said:   9 years ago
Excavation of soil in Cubic meter then how can take in Square meter.

Sachin said:   9 years ago
Pavement measures only in Square meter.

Odongo Augustine said:   9 years ago
Site clearance and leveling.

D.Devi said:   10 years ago
Excavation nothing but Site clearance, clearing n grubbing are measured in Sqm. So the payment will be in Sqm.

Mohipalpur said:   10 years ago
How to estimate of culvert?

Kabijit said:   10 years ago
Estimate for E/W in excavation in foundation trench.

Nathann said:   1 decade ago
How to estimate valve chamber?