Civil Engineering - Estimating and Costing
Exercise : Estimating and Costing - Section 1
- Estimating and Costing - Section 1
- Estimating and Costing - Section 2
1.
Pick up the excavation where measurements are made in square metres for payment.
2.
The expected out turn of 2.5 cm cement concrete floor per manson per day
3.
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
4.
The correct prismoidal formula for volume is
5.
The order of booking dimensions is
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers