Civil Engineering - Estimating and Costing

Exercise :: Estimating and Costing - Section 1

46. 

The measurement is not made in square metres in case of

A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jaffries
D. R.C. Chhajja.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

47. 

According to ISI method of measurement, the order of the sequence is

A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

48. 

The assumption on which the trapezoidal formula for volumes is based, is

A. The end sections are parallel planes
B. The mid-area of a pyramid is half the average area of the ends
C. The volume of the prismoidal is over-es-timted and hence a prismoidal correction is applied
D. All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

49. 

The cross-sections for a highway is taken at

A. right angle to the centre line
B. 30 metres apart
C. intermediate points having abrupt change in gradient
D. the starting end points of the curves
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

50. 

The detention period in a septic tank is assumed

A. 20 minutes
B. 25 minutes
C. 30 minutes
D. 40 minutes

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.