Civil Engineering - Estimating and Costing
Exercise : Estimating and Costing - Section 1
- Estimating and Costing - Section 1
- Estimating and Costing - Section 2
46.
The measurement is not made in square metres in case of
47.
According to ISI method of measurement, the order of the sequence is
48.
The assumption on which the trapezoidal formula for volumes is based, is
49.
The cross-sections for a highway is taken at
50.
The detention period in a septic tank is assumed
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers