Civil Engineering - Estimating and Costing - Discussion
Discussion Forum : Estimating and Costing - Section 1 (Q.No. 46)
46.
The measurement is not made in square metres in case of
Discussion:
16 comments Page 1 of 2.
Elizabeth sunny said:
4 years ago
As per DSR, R.C. Chhajja is measured in m3.
(1)
Sabzar said:
5 years ago
Chajja is measured in running meter.
Vijay kumar said:
5 years ago
Quantity of concrete required for rc chakha is measured in cubic meter.
(1)
Anbu said:
6 years ago
A Chhajja is the projecting or overhanging eaves or cover of a roof, usually supported on large carved brackets.
(2)
Shabaz khan said:
7 years ago
I think that DPC thickness will be less than RC Chajja.
(1)
Asif said:
7 years ago
Please give the clear explanation of the answer.
Shubham Soni said:
7 years ago
RCC Chajjha because its Thickness considering in concreting that's why measured in Cubic metres.
Siddhant umare said:
8 years ago
Rcc chajha
Diksha said:
8 years ago
No, the Formwork is measured in sqm.
Shyam said:
8 years ago
B is right answer because formwork is measure in cum.