31.
The most reliable estiamte is
32.
The expected out turn of 12 mm plastering with cement mortar is
33.
The main factor to be considered while preparing a detailed estimate, is
34.
The damp proof course (D.P.C.) is measured in
35.
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is