Civil Engineering - Estimating and Costing

Exercise : Estimating and Costing - Section 1
36.
The area is measured correct to the nearest
0.01 sqm
0.02 sqm
0.03 sqm
0.04 sqm
0.05 sqm
Answer: Option
Explanation:
No answer description is available. Let's discuss.

37.
Cost of fittings and their fixing is specified for the following sanitary fittings
Water closets
Flushing pipes
Lavatary basins
Sinks
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

38.
The volume is measured correct to the nearest
0.01 cum
0.02 cum
0.03 cum
0.04 cum
0.05 sum
Answer: Option
Explanation:
No answer description is available. Let's discuss.

39.
Pick up the correct statement from the following:
The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

40.
Pick up the item whose weight is added to the weight of respective item, is
Cleats
Brackets
Bolts
Distance separators
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.