Civil Engineering - Estimating and Costing

Exercise :: Estimating and Costing - Section 1

36. 

The area is measured correct to the nearest

A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.04 sqm
E. 0.05 sqm

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

37. 

Cost of fittings and their fixing is specified for the following sanitary fittings

A. Water closets
B. Flushing pipes
C. Lavatary basins
D. Sinks
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

38. 

The volume is measured correct to the nearest

A. 0.01 cum
B. 0.02 cum
C. 0.03 cum
D. 0.04 cum
E. 0.05 sum

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

39. 

Pick up the correct statement from the following:

A. The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
B. The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
C. The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
D. All the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

40. 

Pick up the item whose weight is added to the weight of respective item, is

A. Cleats
B. Brackets
C. Bolts
D. Distance separators
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.