Civil Engineering - Estimating and Costing - Discussion

Discussion :: Estimating and Costing - Section 1 (Q.No.39)

39. 

Pick up the correct statement from the following:

[A]. The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
[B]. The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
[C]. The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
[D]. All the above.

Answer: Option D

Explanation:

No answer description available for this question.