Discussion :: Estimating and Costing - Section 1 (Q.No.32)
32. |
The expected out turn of 12 mm plastering with cement mortar is |
[A]. |
2.5 sq m | [B]. |
4.0 sq m | [C]. |
6.0 sq m | [D]. |
8.0 sq m | [E]. |
10 sq m |
Answer: Option D
Explanation:
No answer description available for this question.
|
Nizam said:
(Jan 4, 2015)
|
|
How it is calculated? |
Puja said:
(Mar 26, 2016)
|
|
How it is calculated, can anyone explain me? |
Soppanna said:
(Mar 30, 2016)
|
|
Can you please explain the calculation? |
Abhilasha said:
(Apr 24, 2016)
|
|
Can anybody know the method for solving the solution. Please explain it. |
Md Aftab said:
(May 28, 2016)
|
|
How it is calculated? Please describe the method. |
Ram said:
(Sep 17, 2016)
|
|
How it is calculated, can anyone explain me? |
Subrata Dhua said:
(Oct 4, 2016)
|
|
As per estimate book by M. Chakraborty, It is 10 sq m. |
Amar said:
(Nov 6, 2016)
|
|
How it is calculated? Please give me the explanation. |
Saddam Baloch said:
(Nov 13, 2016)
|
|
Give the detailed solution, please. |
Teju said:
(Nov 26, 2016)
|
|
The correct answer is 2 cub m for 12 mm plaster.
And 3 cub m for 20 mm plaster. |
Norbu Jamtsho said:
(Nov 30, 2016)
|
|
Can anyone explain me, how it is calculated? |
Mohan said:
(Jan 19, 2017)
|
|
I think it's just an out turn of Mason per day. |
Ankit said:
(Aug 1, 2017)
|
|
I think it is 10 sq m. |
Kishan Singh said:
(Aug 5, 2017)
|
|
It is fixed by PWD.
That a mason can plaster 8 sq mm. |
Madhu said:
(Sep 12, 2017)
|
|
Option E is right. |
Aamir said:
(Dec 22, 2017)
|
|
I also think the correct option should be 10. |
Farooq said:
(Dec 29, 2017)
|
|
It shuold b 10 m3. 8m3 is for 6mm. |
Mohammad Yasir said:
(Apr 8, 2018)
|
|
8 sq mtr is the correct answer. I agree with the given answer. |
Lalan said:
(May 18, 2018)
|
|
The outturn mean efficiency of one Mason is 8sq.m. |
Vishnu said:
(Aug 14, 2018)
|
|
Here, Expected out turn means = How much square meter of plaster of 12 mm thickness can be done by per mason per day.
Which is taken as 8 square meters per mason per day i.e. it means a Mason is expected to do 8 sqm of plastering of 12 mm thickness per day. |