32. 

The expected out turn of 12 mm plastering with cement mortar is

[A]. 2.5 sq m
[B]. 4.0 sq m
[C]. 6.0 sq m
[D]. 8.0 sq m
[E]. 10 sq m

Answer: Option D

Explanation:

No answer description available for this question.

Nizam said: (Jan 4, 2015)  
How it is calculated?

Puja said: (Mar 26, 2016)  
How it is calculated, can anyone explain me?

Soppanna said: (Mar 30, 2016)  
Can you please explain the calculation?

Abhilasha said: (Apr 24, 2016)  
Can anybody know the method for solving the solution. Please explain it.

Md Aftab said: (May 28, 2016)  
How it is calculated? Please describe the method.

Ram said: (Sep 17, 2016)  
How it is calculated, can anyone explain me?

Subrata Dhua said: (Oct 4, 2016)  
As per estimate book by M. Chakraborty, It is 10 sq m.

Amar said: (Nov 6, 2016)  
How it is calculated? Please give me the explanation.

Saddam Baloch said: (Nov 13, 2016)  
Give the detailed solution, please.

Teju said: (Nov 26, 2016)  
The correct answer is 2 cub m for 12 mm plaster.

And 3 cub m for 20 mm plaster.

Norbu Jamtsho said: (Nov 30, 2016)  
Can anyone explain me, how it is calculated?

Mohan said: (Jan 19, 2017)  
I think it's just an out turn of Mason per day.

Ankit said: (Aug 1, 2017)  
I think it is 10 sq m.

Kishan Singh said: (Aug 5, 2017)  
It is fixed by PWD.

That a mason can plaster 8 sq mm.

Madhu said: (Sep 12, 2017)  
Option E is right.

Aamir said: (Dec 22, 2017)  
I also think the correct option should be 10.

Farooq said: (Dec 29, 2017)  
It shuold b 10 m3. 8m3 is for 6mm.

Mohammad Yasir said: (Apr 8, 2018)  
8 sq mtr is the correct answer. I agree with the given answer.

Lalan said: (May 18, 2018)  
The outturn mean efficiency of one Mason is 8sq.m.

Vishnu said: (Aug 14, 2018)  
Here, Expected out turn means = How much square meter of plaster of 12 mm thickness can be done by per mason per day.

Which is taken as 8 square meters per mason per day i.e. it means a Mason is expected to do 8 sqm of plastering of 12 mm thickness per day.