Civil Engineering - Estimating and Costing - Discussion

Discussion Forum : Estimating and Costing - Section 1 (Q.No. 32)
32.
The expected out turn of 12 mm plastering with cement mortar is
2.5 sq m
4.0 sq m
6.0 sq m
8.0 sq m
10 sq m
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
24 comments Page 1 of 3.

Vishnu said:   7 years ago
Here, Expected out turn means = How much square meter of plaster of 12 mm thickness can be done by per mason per day.

Which is taken as 8 square meters per mason per day i.e. it means a Mason is expected to do 8 sqm of plastering of 12 mm thickness per day.
(1)

Teju said:   9 years ago
The correct answer is 2 cub m for 12 mm plaster.

And 3 cub m for 20 mm plaster.

Aman said:   4 years ago
12mm plastering of cement mortar -8 sq mtr.

So, 8 is the correct answer.

Abhilasha said:   9 years ago
Can anybody know the method for solving the solution. Please explain it.

Mohammad yasir said:   7 years ago
8 sq mtr is the correct answer. I agree with the given answer.

Kishan Singh said:   8 years ago
It is fixed by PWD.

That a mason can plaster 8 sq mm.

Subrata dhua said:   9 years ago
As per estimate book by M. Chakraborty, It is 10 sq m.

Amar said:   9 years ago
How it is calculated? Please give me the explanation.

Lalan said:   7 years ago
The outturn mean efficiency of one Mason is 8sq.m.

Md aftab said:   9 years ago
How it is calculated? Please describe the method.