18.
For completion of a project, the critical path of the network represents
minimum time
maximum time
maximum cost
minimum cost.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
40 comments Page 3 of 4.

Himal said:   7 years ago
The right Option is A.

Lokesh aggarwal said:   6 years ago
Critical path shows the maximum time so that all the activities have sufficeint time to be completed.

PAWAN said:   6 years ago
The right option is A. Because no time for delay in critical path.

Naveen said:   6 years ago
Answer will be B time taken along critical path is always maximum.

Sunil said:   6 years ago
The Corrct Answer is A. Though CP is the longest time in any series of activities. When the activities are completed, for that project, the completion time is the minimum time required for the project to complete.

Khaled said:   6 years ago
The critical path has the longest duration more than any path in the diagram so the correct answer is B.

Amrit Kshetri said:   6 years ago
Answer A is correct in a sense that at least that amount of critical time is required for the project to complete and the project can't be completed shorter than that time. So critical time is the minimum possible time.

Abdul Muttalib baloch said:   6 years ago
Critical path is the longest and consumes maximum resources and minimum time.

Ashfaq said:   6 years ago
The critical path is longest path consumes max time and resources so option B is correct.

Source khurmi book.

Kdm said:   5 years ago
Critical path is the longest path gives the short duration.