21.
Power stations are generally treated as
light construction
heavy construction
industrial construction
electrical construction.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

22.
An event is indicated on the network by a number enclosed in
a circle
a square
a triangle
an ellipse
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

23.
Pick up the incorrect statement from the following:
The difference between the earliest start time and latest finish time of any activity, is the maximum time available for the activity
The difference between the maximum time available for the job and actual time it consumes, is called total float
The difference between the latest start time and earliest start time of an activity, is called total float
The difference between the earliest finish time of an activity and the earliest start time of its successor activity, is called free float of the activity
None of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

24.
While scheduling a project by C.P.M.
a project is divided into various activities
required time for each activity is established
sequence of various activities is made according to their importance
net work is drawn by connecting the activities and the events
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

25.
Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
Earliest occurrence time of the event from which the activity arrow' originates, is called earliest start time of the activity
Earliest occurrence time of the event from which the activity arrow originates plus the duration of the activity, is called earliest finish time of the activity
The latest occurrence time of the node of which the activity arrow terminates minus the duration of the activity, is called latest start time
The latest occurrence time for the node at which the activity arrow terminates, is called latest finish time
All the above.
Answer: Option
Explanation: