Civil Engineering - Construction Management

Exercise : Construction Management - Section 2
11.
The final selection of a construction site, is done by
departmental representative or user
local civil authority representative
representative of engineer authority
representative of administration
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

12.
Pick up the correct statement from the following:
The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called 'float'
The duration of time by which an activity can be delayed without affecting the succeeding activity, is called free float
The float which affects neither the processor nor the successor activities, is called independent float
The difference between total float and free float, is called interfering float
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

13.
The first stage of a construction, is
preparation of estimate
survey of the site
initiation of proposal
preparation of tender
allotment of funds.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

14.
PERT is
an analytic in concept
limited of event oriented diagrams
used for research and development projects
based on three time estimates for activities linking up two events
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

15.
Residential buildings are treated as
light construction
heavy construction
industrial construction
private construction.
Answer: Option
Explanation:
No answer description is available. Let's discuss.