Pick up the correct statement from the following:
The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called 'float'
The duration of time by which an activity can be delayed without affecting the succeeding activity, is called free float
The float which affects neither the processor nor the successor activities, is called independent float
The difference between total float and free float, is called interfering float
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
2 comments Page 1 of 1.

Anonymous said:   2 years ago
Optin B, and C are the definitions, so these two are correct.

Anomies said:   7 years ago
Give an Explanation for the answer.