A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:
Answer: Option
Explanation:
Ratio of times taken by A and B = 1 : 3.
The time difference is (3 - 1) 2 days while B take 3 days and A takes 1 day.
If difference of time is 2 days, B takes 3 days.
| If difference of time is 60 days, B takes | ![]() |
3 | x 60 | ![]() |
= 90 days. |
| 2 |
So, A takes 30 days to do the work.
| A's 1 day's work = | 1 |
| 30 |
| B's 1 day's work = | 1 |
| 90 |
| (A + B)'s 1 day's work = | ![]() |
1 | + | 1 | ![]() |
= | 4 | = | 2 |
| 30 | 90 | 90 | 45 |
A and B together can do the work in |
45 | = 22 | 1 | days. |
| 2 | 2 |
Discussion:
284 comments Page 13 of 29.
Subhranil Mondal said:
9 months ago
Assume B can do it in x days.
So A can in x/3 days.
x - x/3 = 60.
then x = 90.
So B can do the work in 90 days.
A can do it in 90/3 = 30 days.
A and B together can do it in 90 * 30/90 + 30 = 22.5 (Ans).
So A can in x/3 days.
x - x/3 = 60.
then x = 90.
So B can do the work in 90 days.
A can do it in 90/3 = 30 days.
A and B together can do it in 90 * 30/90 + 30 = 22.5 (Ans).
(24)
Poor gamer said:
1 decade ago
Let A takes x days and B takes 60+x days.
Its given that A takes 1 days when B takes 3 days.
So,
1/3 = x/x+60.
Cross multiply and we get x = 30 i.e A.
X+60 = 30 + 60 = 90 i.e B.
Remaining as usual.
Its given that A takes 1 days when B takes 3 days.
So,
1/3 = x/x+60.
Cross multiply and we get x = 30 i.e A.
X+60 = 30 + 60 = 90 i.e B.
Remaining as usual.
Kavya said:
1 decade ago
A is twice as good a workmen as B and together they can finish a piece of work in 18days. In how many days will A alone finish the work?
Can we solve the above problem using the formula k*x/k^2-1.
Can we solve the above problem using the formula k*x/k^2-1.
Rajeesh kumar said:
5 years ago
@All.
We can easily convert it to a linear equation.
Let B requires x days and forA it is y
it is given,x = 3y.
In the same way;
X-60=Y
By solving we have 2x- 180=0 :.x=90.
and y=90 - 60 = 30.
We can easily convert it to a linear equation.
Let B requires x days and forA it is y
it is given,x = 3y.
In the same way;
X-60=Y
By solving we have 2x- 180=0 :.x=90.
and y=90 - 60 = 30.
Ameer said:
7 years ago
Thank you, excellent explanation.
a = 3b --> (1).
a-b = 60.
3b-b = 60.
2b = 60.
b = 30.
If b = 30 then from 1a = 3 x 30 = 90.
Now,
= 1/30+1/90.
= 3+1/90.
= 4/90 = 2/45.
= 45/2 = 22.5 days.
a = 3b --> (1).
a-b = 60.
3b-b = 60.
2b = 60.
b = 30.
If b = 30 then from 1a = 3 x 30 = 90.
Now,
= 1/30+1/90.
= 3+1/90.
= 4/90 = 2/45.
= 45/2 = 22.5 days.
Jeev said:
7 years ago
3A = B.
If 60 is less than b(then 60 is two times of a)
then A=30,
b = 3 * 30 = 90,
a+b=1/30+1/90,
3*1/90+1/90,
(3+1)/90.
Where 4/90(to get days upside down).
90/4 = 22(1/2) days.
If 60 is less than b(then 60 is two times of a)
then A=30,
b = 3 * 30 = 90,
a+b=1/30+1/90,
3*1/90+1/90,
(3+1)/90.
Where 4/90(to get days upside down).
90/4 = 22(1/2) days.
MOSA said:
6 years ago
Let a did this work in X days.
B can do it in 3x days.
X+60=3x.
X=30.
It means A can complete this work in 30 days and B in 90 days;
Capacity of;
A is 3.
B is 4.
A+B= 4.
TIME =90/4.
B can do it in 3x days.
X+60=3x.
X=30.
It means A can complete this work in 30 days and B in 90 days;
Capacity of;
A is 3.
B is 4.
A+B= 4.
TIME =90/4.
Ajishwarya said:
2 months ago
A is thrice as good a workman as B:
So, A = 3 B.
Substitute A as 1/60.
1/60*3 = B.
1/180 = B
Working together :
A + B = 1/60 + 1/180.
= 4/180,
= 1/45 = 45 Days.
So, A = 3 B.
Substitute A as 1/60.
1/60*3 = B.
1/180 = B
Working together :
A + B = 1/60 + 1/180.
= 4/180,
= 1/45 = 45 Days.
(10)
Pratyush said:
1 decade ago
Can we do it like this:
a = 3b....(1).
a-b = 60.
3b-b = 60.
2b = 60.
b = 30.
If b = 30 then from 1a = 3x30 = 90.
Now,
= 1/30+1/90.
= 3+1/90.
= 4/90 = 2/45.
= 45/2 = 22.5 days.
a = 3b....(1).
a-b = 60.
3b-b = 60.
2b = 60.
b = 30.
If b = 30 then from 1a = 3x30 = 90.
Now,
= 1/30+1/90.
= 3+1/90.
= 4/90 = 2/45.
= 45/2 = 22.5 days.
Jezan said:
1 decade ago
According to this question if A is x, B will be x+60
1/3=x/x+60
3x=x+60
2x=6
x=30
A+B'S ONE DAY WORK=1/30+1/90=2/45
SO WHOLE WORK S= 45/2( UPSIDE DOWN)
22.5 DAYS.
HOPE ALL LL GET DIS
1/3=x/x+60
3x=x+60
2x=6
x=30
A+B'S ONE DAY WORK=1/30+1/90=2/45
SO WHOLE WORK S= 45/2( UPSIDE DOWN)
22.5 DAYS.
HOPE ALL LL GET DIS
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers


A and B together can do the work in