Mechanical Engineering - Industrial Engineering and Production Management

Exercise :: Industrial Engineering and Production Management - Section 2

36. 

Acceptance sampling is used in

A. job production
B. batch production
C. mass production
D. all of these

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

37. 

Queuing theory is used for

A. job-shop scheduling
B. inventory problems
C. traffic congestion studies
D. all of these

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

38. 

Which of the following statement is correct?

A. When slack of an activity is zero, it falls only on critical path.
B. CPM technique is useful to minimise the direct and indirect expenses.
C. Critical path of a net work represents the minimum time required for completion of project.
D. all of the above

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

39. 

Break even point is the point where

A. fixed and variable cost lines intersect
B. fixed and total cost lines intersect
C. variable and total cost lines intersect
D. sales revenue and total expensive lines intersect

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

40. 

In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a

A. belt conveyor
B. bucket conveyor
C. fork lift truck
D. overhead crane

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.