36.
Acceptance sampling is used in
job production
batch production
mass production
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.

37.
Queuing theory is used for
job-shop scheduling
inventory problems
traffic congestion studies
all of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.

38.
Which of the following statement is correct?
When slack of an activity is zero, it falls only on critical path.
CPM technique is useful to minimise the direct and indirect expenses.
Critical path of a net work represents the minimum time required for completion of project.
all of the above
Answer: Option
Explanation:
No answer description is available. Let's discuss.

39.
Break even point is the point where
fixed and variable cost lines intersect
fixed and total cost lines intersect
variable and total cost lines intersect
sales revenue and total expensive lines intersect
Answer: Option
Explanation:
No answer description is available. Let's discuss.

40.
In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a
belt conveyor
bucket conveyor
fork lift truck
overhead crane
Answer: Option
Explanation:
No answer description is available. Let's discuss.