Civil Engineering - Waste Water Engineering - Discussion
Discussion Forum : Waste Water Engineering - Section 4 (Q.No. 48)
48.
You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at
Discussion:
14 comments Page 1 of 2.
S~Khattak said:
3 years ago
The Correct option is two-thirds full.
==> if D<4 then half full,
==> if 0.4<D<0.9 then two-third full,
==> if D> 0.9 then three-fourth full.
==> if D<4 then half full,
==> if 0.4<D<0.9 then two-third full,
==> if D> 0.9 then three-fourth full.
(4)
Gayatri sangale said:
4 years ago
Yes, it's 2/3rd.
(1)
MONU said:
4 years ago
Yes, it's 2/3rd of full maximum discharge.
Anirban Roy said:
4 years ago
If dia < 0.4m then 1/2 full.
0.4m < dia <0.9m then 2/3 full.
dia > 0.9m then 3/4 full.
0.4m < dia <0.9m then 2/3 full.
dia > 0.9m then 3/4 full.
Pravin said:
5 years ago
2/3rd is the correct answer.
ER NK said:
6 years ago
It's 2/3rd.
Thanks for the explanation @Deepak G S.
Thanks for the explanation @Deepak G S.
Kajol said:
6 years ago
Yes, correct @Deepak.
The answer should be two-third full.
The answer should be two-third full.
Chauhan said:
6 years ago
Answer is 2/3 full.
Digneshsoni said:
7 years ago
It is 2/3 for full.
Mahim said:
7 years ago
It is 2/3 full.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers