48.
You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at
Discussion:
14 comments Page 1 of 2.
S~Khattak said:
2 years ago
The Correct option is two-thirds full.
==> if D<4 then half full,
==> if 0.4<D<0.9 then two-third full,
==> if D> 0.9 then three-fourth full.
==> if D<4 then half full,
==> if 0.4<D<0.9 then two-third full,
==> if D> 0.9 then three-fourth full.
(2)
Deepak G S said:
7 years ago
It's two-third full.
up to 0.4m - half full.
0.4 to 0.9 - two third.
Greater than 0.9m - three-fourth full.
up to 0.4m - half full.
0.4 to 0.9 - two third.
Greater than 0.9m - three-fourth full.
Anirban Roy said:
3 years ago
If dia < 0.4m then 1/2 full.
0.4m < dia <0.9m then 2/3 full.
dia > 0.9m then 3/4 full.
0.4m < dia <0.9m then 2/3 full.
dia > 0.9m then 3/4 full.
Kajol said:
5 years ago
Yes, correct @Deepak.
The answer should be two-third full.
The answer should be two-third full.
ER NK said:
5 years ago
It's 2/3rd.
Thanks for the explanation @Deepak G S.
Thanks for the explanation @Deepak G S.
MONU said:
3 years ago
Yes, it's 2/3rd of full maximum discharge.
Davinder saini said:
7 years ago
As per my knowledge it is two-third full.
Saunak said:
7 years ago
You are absolutely correct @Deepak.
Karthik said:
6 years ago
I think it is two third full.
Pravin said:
4 years ago
2/3rd is the correct answer.