Civil Engineering - Waste Water Engineering - Discussion
Discussion Forum : Waste Water Engineering - Section 4 (Q.No. 48)
48.
You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at
Discussion:
14 comments Page 2 of 2.
Karthik said:
7 years ago
I think it is two third full.
Davinder saini said:
8 years ago
As per my knowledge it is two-third full.
Saunak said:
8 years ago
You are absolutely correct @Deepak.
Deepak G S said:
8 years ago
It's two-third full.
up to 0.4m - half full.
0.4 to 0.9 - two third.
Greater than 0.9m - three-fourth full.
up to 0.4m - half full.
0.4 to 0.9 - two third.
Greater than 0.9m - three-fourth full.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers