Civil Engineering - Tunnelling
Exercise : Tunnelling - Section 1
- Tunnelling - Section 1
1.
Which one of the following statements is not correct for heading and benching method of tunnelling ?
2.
The difference of heights of the tunnels above rail tops of BG and MG tracks is kept
3.
In case of drift method of tunnelling, the drift may be excavated at
4.
A tunnel is found more advantageous as compared to the alternate routes because it:
5.
For B.G. single track railway, the height of the tunnel above top of rails should be
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers