Civil Engineering - Tunnelling

Why should I learn to solve Civil Engineering questions and answers section on "Tunnelling"?

Learn and practise solving Civil Engineering questions and answers section on "Tunnelling" to enhance your skills so that you can clear interviews, competitive examinations, and various entrance tests (CAT, GATE, GRE, MAT, bank exams, railway exams, etc.) with full confidence.

Where can I get the Civil Engineering questions and answers section on "Tunnelling"?

IndiaBIX provides you with numerous Civil Engineering questions and answers based on "Tunnelling" along with fully solved examples and detailed explanations that will be easy to understand.

Where can I get the Civil Engineering section on "Tunnelling" MCQ-type interview questions and answers (objective type, multiple choice)?

Here you can find multiple-choice Civil Engineering questions and answers based on "Tunnelling" for your placement interviews and competitive exams. Objective-type and true-or-false-type questions are given too.

How do I download the Civil Engineering questions and answers section on "Tunnelling" in PDF format?

You can download the Civil Engineering quiz questions and answers section on "Tunnelling" as PDF files or eBooks.

How do I solve Civil Engineering quiz problems based on "Tunnelling"?

You can easily solve Civil Engineering quiz problems based on "Tunnelling" by practising the given exercises, including shortcuts and tricks.

Exercise : Tunnelling - Section 1
  • Tunnelling - Section 1
1.
Which one of the following statements is not correct for heading and benching method of tunnelling ?
Drilling and mucking can be done simultaneously
Benching provides a plateform for working on heading
Removal of muck from the heading is very easy
None of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

2.
The difference of heights of the tunnels above rail tops of BG and MG tracks is kept
0.30 m
0.45 m
0.60 m
0.75 m
Answer: Option
Explanation:
No answer description is available. Let's discuss.

3.
In case of drift method of tunnelling, the drift may be excavated at
the centre
the bottom
the top
the side
All of the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

4.
A tunnel is found more advantageous as compared to the alternate routes because it:
remains free from snow
reduces the cost by reducing the route distance
reduces the maintenance cost
avoids interference with surface rights
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

5.
For B.G. single track railway, the height of the tunnel above top of rails should be
5.5 m to 5.8 m
5.8 m to 6.2 m
6.7 m to 7.3 m
7.3 m to 7.5 m
Answer: Option