Civil Engineering - Tunnelling
Exercise : Tunnelling - Section 1
- Tunnelling - Section 1
41.
High pressure grouting is generally restored for concreting in the lining if the rock strata is:
42.
For hauling muck from the tunnel, the following type of muck-car is used :
43.
Which one of the following methods is adopted for permanent drainage of tunnels :
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers