Civil Engineering - RCC Structures Design - Discussion

Discussion Forum : RCC Structures Design - Section 3 (Q.No. 44)
44.
On piles, the drop must be at least
80 cm
100 cm
120 cm
140 cm
150 cm
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
3 comments Page 1 of 1.

Priyanka Shah said:   6 years ago
What is meant by Drop?

Prakash said:   6 years ago
It is hammer used for pile driving.
(2)

Aaron said:   6 years ago
The piles are pushed to the ground to carry the surface loads or heavy structures above it.

Now the drop means the transfer of piles to the exact location when we can release the piles at 120 cm.
(3)

Post your comments here:

Your comments will be displayed after verification.