Civil Engineering - RCC Structures Design - Discussion
Discussion Forum : RCC Structures Design - Section 3 (Q.No. 44)
44.
On piles, the drop must be at least
Discussion:
3 comments Page 1 of 1.
Aaron said:
6 years ago
The piles are pushed to the ground to carry the surface loads or heavy structures above it.
Now the drop means the transfer of piles to the exact location when we can release the piles at 120 cm.
Now the drop means the transfer of piles to the exact location when we can release the piles at 120 cm.
(3)
Prakash said:
6 years ago
It is hammer used for pile driving.
(2)
Priyanka Shah said:
6 years ago
What is meant by Drop?