Slump values for Road construction= 20 - 40 mm.
Piers,beams, column , parapet, walls Slabs = 40 mm - 50 mm.
Canal lining= 70 - 80mm.
RCC work = 50 - 150 mm.
Mass concrete= 25 mm - 50 mm.
Vibrated concrete= 10 - 25 mm
Piers,beams, column , parapet, walls Slabs = 40 mm - 50 mm.
Canal lining= 70 - 80mm.
RCC work = 50 - 150 mm.
Mass concrete= 25 mm - 50 mm.
Vibrated concrete= 10 - 25 mm
Suraj said:
4 years ago
As per IS 456, it should be between 25 - 50 mm.
Ajay Sharma said:
4 years ago
I too agree, Option A correct.
Susheel kumar said:
4 years ago
Road pavement slump 20-40mm.
Mahesh sinh said:
5 years ago
Option A is correct for pavement concrete.
(2)
Satish said:
6 years ago
Answer is A.
A Slump is between 20-40 mm for road or pavement construction.
A Slump is between 20-40 mm for road or pavement construction.
(2)
Amit bhate said:
7 years ago
A is the right answer the slump vary 1 cm to 4 cm according to MORTH SECTION 600.
Pankaj yadav said:
7 years ago
For the road, slump should be 30 to 50.
But in this question, freshly mixed concrete should be 50 to 70 mm.
But in this question, freshly mixed concrete should be 50 to 70 mm.
(1)
Epcet amit said:
7 years ago
The slump value of pavement construction is 20 to 40 mm. So from the above option A is correct.
Lkjha said:
8 years ago
Slump Specified as 25 mm (1.0 inch). This is typical for pavement PCC. Ans 1 is correct.