To indicate proper control of consistency of a freshly mixed concrete for pavement construction, the slump should be between
3 to 5 cm
4 to 6 cm
5 to 7 cm
7 to 10 cm
10 to 12 cm
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
15 comments Page 1 of 2.

Sajjad Ali said:   10 months ago
Slump values for Road construction= 20 - 40 mm.
Piers,beams, column , parapet, walls Slabs = 40 mm - 50 mm.
Canal lining= 70 - 80mm.
RCC work = 50 - 150 mm.
Mass concrete= 25 mm - 50 mm.
Vibrated concrete= 10 - 25 mm

Suraj said:   4 years ago
As per IS 456, it should be between 25 - 50 mm.

Ajay Sharma said:   4 years ago
I too agree, Option A correct.

Susheel kumar said:   4 years ago
Road pavement slump 20-40mm.

Mahesh sinh said:   5 years ago
Option A is correct for pavement concrete.
(2)

Satish said:   6 years ago
Answer is A.

A Slump is between 20-40 mm for road or pavement construction.
(2)

Amit bhate said:   7 years ago
A is the right answer the slump vary 1 cm to 4 cm according to MORTH SECTION 600.

Pankaj yadav said:   7 years ago
For the road, slump should be 30 to 50.

But in this question, freshly mixed concrete should be 50 to 70 mm.
(1)

Epcet amit said:   7 years ago
The slump value of pavement construction is 20 to 40 mm. So from the above option A is correct.

Lkjha said:   8 years ago
Slump Specified as 25 mm (1.0 inch). This is typical for pavement PCC. Ans 1 is correct.